Special-Engineered Equipment
Suspended Process Structures
Suspended structures supporting process lines in the Astana Motors automotive plant welding shop.

01 · Project Overview
Project Data and Participants
Almaty · 2024 · Special-Engineered Equipment · KMD · Calculation Report
- Year
- 2024
- Location
- Almaty
- Scope
- KMD · Calculation Report · Special-Engineered Structure
- Client
- Astana Motors
- Main Contractor
- ТОО «ТехноВиД плюс»
- Lead Designer
- Steel Solutions LLP
- Steel Tonnage
- 680 t
- Key Features
- automotive welding-shop process lines; site design supervision
Project 3D Model
Explore the Suspended Structures 3D Model
Inspect the main lines, suspended elements and their position within the welding shop.
Source: lightweight browser model · loads on demand

Preparing 3D model…The 3D model is ready to view
Rotate — drag · Zoom — mouse wheel or pinch gesture
02 · Project Materials
Model, Schemes and Working Drawings
Each image comes from an actual project package. Open an item to inspect the geometry and detailing at a larger scale.
Next Step
Planning a Project with Similar Requirements?
Send a description of the facility and the available project information. We will clarify the brief, scope of work and required deliverables.
