Industrial Facility
Confectionery Factory
Design of a hybrid structural steel frame for a confectionery factory in Shymkent.

01 · Project Overview
Project Data and Participants
Shymkent · 2024 · Industrial Facility · KM · KMD · Calculation Report · LGSF
- Year
- 2024
- Location
- Shymkent
- Scope
- KM · KMD · Calculation Report · LGSF
- Main Contractor
- ShymKovStroy LLP
- Lead Designer
- Steel Solutions LLP
- Dimensions
- 15 × 107 m
- Storeys
- 1
- Floor Area
- 1,600 m²
- Steel Tonnage
- 54 t
- Key Features
- hybrid frame; Seismic Intensity 8
02 · Project Materials
Model, Schemes and Working Drawings
Each image comes from an actual project package. Open an item to inspect the geometry and detailing at a larger scale.
Next Step
Planning a Project with Similar Requirements?
Send a description of the facility and the available project information. We will clarify the brief, scope of work and required deliverables.